Water Treatment

Industrial Development (Project Jennifer)

The client required an extensive survey for a large development around a residential estate.

Parts of the site had been demolished prior to the survey, with ongoing works encompassing the site. Due to the activity on site we were required to complete the survey with a 2 metre GPR grid sweep across the site to confirm our locates.

Case Study PDF